Shandong Hongteng Fengda Metal Material Co, Ltd. 86-133-3513-5182 admin@htfdsteel.com
10mm-406.4mm Carbon Steel Round Tube S235J2W S355J2W Carbon Welded Steel Pipe

10mm-406.4mm Carbon Steel Round Tube S235J2W S355J2W Carbon Welded Steel Pipe

  • Highlight

    406.4mm Carbon Steel Round Tube

    ,

    10mm Carbon Steel Round Tube

    ,

    S355J2W Carbon Welded Steel Pipe

  • Type
    Welded
  • Technique
    Hot Rolled
  • Size
    10*10-600*600mm
  • Length
    3-12m
  • Terms Of Price
    FOB EXW CIF
  • Production Capacity
    10000tons Per Month
  • Place of Origin
    China
  • Brand Name
    HTFD
  • Certification
    CE ISO CNAS CQC
  • Model Number
    Q195 Q215 Q235A Q235B Q235C 20# 45# 16Mn Q345 L245 L290 X42 X46 X60 X80
  • Minimum Order Quantity
    1Ton
  • Price
    USD 400-600
  • Packaging Details
    Standard Export Package
  • Delivery Time
    5-15 working days
  • Payment Terms
    T/T
  • Supply Ability
    10000tons Per Month

10mm-406.4mm Carbon Steel Round Tube S235J2W S355J2W Carbon Welded Steel Pipe

Q195 Q215 Q235a Q235b Q235c 20# 45# 16mn Q345 L245 L290 X42 X46 X60 X80 Carbon Steel Round Welded Steel Pipe

 

Material Grade Q195,Q215 A,Q215 B,Q235 A,Q235 B,Q235 C,
Q235D,Q275,Q275B,Q275C,Q275D,Q295,Q345,Q390,Q420, Q460,
SS330,SS400,SS490,SS540,A36,1,GR.36,50(245),55(380),42(290),
60(415),65(450),S185(1.0035),S235JO(1.0114), S235JR(1.0038),
S235J2(0.0117),S275JR(1.0044),S275JO(1.10143),S355JO(1.0553),
E295(1.0050),E335(1.0060), S235J2W(1.861),S355J2W(1.8965),10#,
15#20#
Standard GB,JIS,ASTM,BS,DIN,API,...
Wall Thickness 0.13-60mm or as required
OD Round Pipe: 10mm-406.4mm
Square Pipe: 10mm*10mm~500mm*500mm
Rectangular Pipe:10mm*20mm~400mm*600mm
Length 5.8M;6M;6.4M;12M
Pipe end  1)Plain;2)Beveled;3)Threaded;4)Socket with holes;5)with  PVC clap/coupling/clamp
Surface Oiled, Polished, Brightness, Metallic color.Black paint,Galvanized 
Technique Hot Rolled /Cold Rolled
Usage general engineering structure , cars, bridges, ships, boilers ,pressure vessels …
Trade Terms EXW,FOB,CIF CFR
Loading Port Shanghai port, Tianjin port, Qindao port
Payment terms 1) 30% deposit by T/T, the balance against copy of B/L by T/T.
2) 30% deposit by T/T, the balance by L/C at sight.
3) 100% L/C at sight.
MOQ 1Ton
Packing Detail Standard export package:Wooden pallet +paperboard +steel strip(Customized requirements are accepted)
Delivery time 1.Usually,within10-20days after receiving deposit or LC.
2.According to the order quantity
Samples Free samples are provided but the fright is borne by the buyer

 

10mm-406.4mm Carbon Steel Round Tube S235J2W S355J2W Carbon Welded Steel Pipe 0