Shandong Hongteng Fengda Metal Material Co, Ltd. 86-133-3513-5182 admin@htfdsteel.com
Seamless Weld Tube ASTM A106 A36 A53 A192 Q235 Carbon Steel Pipe

Seamless Weld Tube ASTM A106 A36 A53 A192 Q235 Carbon Steel Pipe

  • Highlight

    ASTM A106 carbon steel pipe

    ,

    seamless weld steel tube

    ,

    Q235 carbon steel pipe

  • Technique
    Hot Rolled
  • Type
    Seamless
  • Section Shape
    Round
  • Length
    Customizable
  • Width
    Customizable
  • Quality Control
    100% Inspection
  • Place of Origin
    china
  • Brand Name
    DTFD
  • Certification
    CE ISO CNAS CQC SGS
  • Model Number
    AISI 1020 1008
  • Minimum Order Quantity
    1T
  • Price
    $600-1000
  • Packaging Details
    Standard Seaworthy Package
  • Delivery Time
    15-20 days or subject to the clients' requirement and quantity
  • Payment Terms
    L/C, T/T

Seamless Weld Tube ASTM A106 A36 A53 A192 Q235 Carbon Steel Pipe

Description

 

Product Name
Carbon Steel Pipe
Material
A53 Gr.B,A36,ST52,ST35,ST42,ST45,X42,X46,X52,X60,X65X70
Standard
API 5L,ASTM A106 Gr.B,ASTM A53 Gr.B,ASTM A179/A192,ASTM A513,ASTM A671,ASTM A672,BS EN 10217,BS EN10296,BS EN 39,BS6323,DIN
EN10217
Certificates
API 5L,ISO9001,SGS,BV,CCIC
Outer Diameter
15mm-1200mm
Wall Thickness
SCH10,SCH20,SCH30,STD,SCH40,SCH60,SCH80,SCH100,SCH120,SCH160,XS,XXS
Length
1m,4m,6m,8m,12m according to buyer's request
Surface Treatment
black paint,varnish,oil,galvanized,anti-corrosion coated
Marking
Standard marking,or according to your request.Marking Method:Spray white paint
End Treatment
Plain End/Bevelled End/Grooved End/Threaded End With Plastic Caps
Technique
Hot Rolled or Cold Rolled ERW
Application
Liquid delivery,structure pipe,construction,petroleum cracking,oil pipe,gas pipe
Seamless Weld Tube ASTM A106 A36 A53 A192 Q235 Carbon Steel Pipe 0
The raw material of the carbon steel pipe is a round tube blank, and the round tube embryo is cut by the cutting machine and the growth of the blank is about 1 meter, and is sent to the furnace by the conveyor belt for heating. The billets are heated in a furnace at a temperature of about 1200 degrees Celsius. The fuel is hydrogen or acetylene. The temperature control in the furnace is the key problem. After the round tube billet is released, it must be perforated by the pressure piercing machine. Generally, the most common piercing machine is the conical roll piercing machine, which has high production efficiency, good product quality, large perforating and expanding diameter, and can wear a variety of steel. After the perforation, the round tube blank is successively rolled by three roller skew, continuous rolling or extrusion. After extrusion, the tube should be removed for sizing. The sizing machine rotates into the steel embryo at high speed through the conical drill to punch holes and form the steel pipe. The inner diameter of the steel pipe is determined by the outer diameter length of the caliper drill bit. After the steel pipe is calibrated, it enters the cooling tower and is cooled by water spray. After the steel pipe is cooled, it will be straightened. After the steel pipe is straightened, it is sent to the metal inspection machine (or hydraulic test) for internal inspection. If there are cracks, bubbles and other problems inside the steel pipe, it will be detected. After the steel pipe inspection, it is also strictly selected by hand. After the steel pipe quality inspection, paint the number, specification, production batch number, etc. And hoisted by crane into the warehouse.

Packaging & Shipping

 


Seamless Weld Tube ASTM A106 A36 A53 A192 Q235 Carbon Steel Pipe 1 

 

FAQ

1. Q:Are you trading company or manufacturer?
A: We are professional manufacturer for steel pipes,and our company also is a very protessional and technical foreign trade company for steel products. We have more export expenence with compettive price and best after-sales service Apart from this,we can provide a wide range of steel products to meet the requirement of customer.

2. Q:Can you send samples?

A:Of course, we can send samples to all parts of the world, our samples are free, but customers need to bear the courier costs.
3. Q:About product prices?
A:Prices vary from period to period due to cyclical changes in the price of raw materials.
4. Q:How long does your delivery time take?
A:In general, our delivery time is within 7-25 days, and may be delayed if the demand isextremely large or special circumstances occur.
5. Q:Does the product have quality inspection before loading?
A:Of course, all our products are strictly tested for quality before packaging, and unqualified products will be destroyed.